Visit our location
House No. 13B, Street No. 34, Sector F-7/1, Islamabad, Pakistan
Opening Hours:
Mon-Fri 8am-5pm
Send us mail
info@integrationenergy.org
Phone Number
+92518317491
Parent Company

Pamir Energy (Low Head Hydropower Project (1.4 MW) Hunza River )

Low Head Hydropower Project (1.4 MW) Hunza River – Feasibility Study, Design and Procurement – Conducted feasibility study and detailed engineering design for a 1.4 MW hydropower scheme in Hunza; delivered feasibility report, working drawings, and tender documents, and assisted in procurement negotiations.