Low Head Hydropower Project (1.4 MW) Hunza River – Feasibility Study, Design and Procurement – Conducted feasibility study and detailed engineering design for a 1.4 MW hydropower scheme in Hunza; delivered feasibility report, working drawings, and tender documents, and assisted in procurement negotiations.