Visit our location
House No. 13B, Street No. 34, Sector F-7/1, Islamabad, Pakistan
Opening Hours:
Mon-Fri 8am-5pm
Send us mail
info@integrationenergy.org
Phone Number
+92518317491
Parent Company

Hydropower

Feasibility Study of Bypass Road from Ganish Murtazabad to Hassanabad Hunza
Road Development

Feasibility Study of Bypass Road from Ganish Murtazabad to Hassanabad Hunza

  This entry appears to describe a project record with the following details: Project Duration:From 01 September 2023 to 31 January 2024 Project Title:Feasibility study and detailed consultancy services for constructing a bypass road connecting: Ganish Murtazabad Hassanabad (located in Hunza region) Client / Department:GB-PWD (Gilgit-Baltistan Public Works Department) Location:Gilgit-Baltistan

Road Development

Construction/ Metaling of Road from Gorikote Astore to Shagharthang Skardu

Design Review & Construction Supervision of Inter-Regional Connectivity between Baltistan and Diamer-Astore Division(Road Metaling from Gorikot–Astore to Shagarthang–Skardu) This project focuses on strengthening inter-regional connectivity between Baltistan and Diamer-Astore Division through the improvement and upgrading of an important road corridor. The assignment includes: Design review to ensure compliance with engineering

Construction Supervision of Inter - Provincial Connectivity Economic Corridor Through Gilgit – Baltistan & AJ&K (Thallichi GB – Shounter AJ&K)
Road Development

Management and construction supervision of Astore Valley Road (AVR)

This project represents a communication sector initiative focused on improving road infrastructure in a remote and mountainous area. The work involves developing a reliable road network to connect isolated communities with main urban centers. The project includes: Construction and rehabilitation of road corridors Development of bridges and culverts for water

Construction of Road from Pissan to Hoper Nagar (40 Km) I/C Bridges and Allied Structures ( Shahrah e Nagar)
Road Development

Construction of Road from Pissan to Hoper Nagar (40 Km) with LC Bridges and Allied Structures

This project focuses on the development of a 40-kilometer road corridor connecting Pissan to Hoper Nagar in Gilgit-Baltistan. The initiative is part of the communication sector aimed at improving connectivity in remote mountainous regions. The scope includes: Construction of a new road alignment across difficult terrain Development of LC (Low-Cost)

Hydropower

Development of Energy Master Plan for Chitral (Khyber Pakhtunkhwa) (NPAK)

Development of Energy Master Plan for Chitral (Khyber Pakhtunkhwa) – Prepared an integrated energy master plan for Chitral district (KP) under the EU-funded Energy Plus program; assessed renewable energy options (hydro, solar, etc.), conducted demand projections, and delivered an actionable master plan with investment recommendations.

Pamir Energy
Hydropower

Pamir Energy (Low Head Hydropower Project (1.4 MW) Hunza River )

Low Head Hydropower Project (1.4 MW) Hunza River – Feasibility Study, Design and Procurement – Conducted feasibility study and detailed engineering design for a 1.4 MW hydropower scheme in Hunza; delivered feasibility report, working drawings, and tender documents, and assisted in procurement negotiations.

Hydropower

Water and Power Division Gilgit (30 MW 0

Design, Construction Supervision and Contract Management for 30 MW Hydropower Project Ghowari (Ghanche, GB) – Prepared tender designs, initial environmental examination (IEE) reports, and bidding documents for the 30 MW Ghowari hydropower project; provided supervision and contract management throughout the 5-year construction period.

Hydropower

Water and Power Division Gilgit (20 MW Hydropower )

Monitoring & Evaluation Consultant for 20 MW Hydropower Project Hanzel (Gilgit) – Served as M&E consultant during project implementation; monitored construction progress and quality, verified contractors’ work measurements and payments, managed project reporting, and evaluated project outcomes for the 20 MW Hanzel hydropower project.

Hydropower

Water and Power Division Gilgit (5–10 MW )

Feasibility Study for Construction of Hydropower Project on Gilgit River at Sonikot (Gilgit) – Carried out a detailed feasibility study (including site investigations, engineering designs, and environmental study) for a proposed 5–10 MW hydropower plant at Sonikot; prepared the feasibility report, detailed drawings, and bidding documents (PC-1) for the client

Water and Power Division Gilgit (4 MW Batura hydropower)
Hydropower

Water and Power Division Gilgit (4 MW Batura hydropower)

Feasibility Study for the HRE III Project – Conducted feasibility studies for multiple micro-hydropower sites and updated the detailed design for a new 4 MW Batura hydropower plant under the HRE III program (Hydropower & Renewable Energy III); delivered feasibility reports and revised designs to the client.