Solar PV

Feasibility Study of Bypass Road from Ganish Murtazabad to Hassanabad Hunza
Road Development

Feasibility Study of Bypass Road from Ganish Murtazabad to Hassanabad Hunza

  This entry appears to describe a project record with the following details: Project Duration:From 01 September 2023 to 31 January 2024 Project Title:Feasibility study and detailed consultancy services for constructing a bypass road connecting: Ganish Murtazabad Hassanabad (located in Hunza region) Client / Department:GB-PWD (Gilgit-Baltistan Public Works Department) Location:Gilgit-Baltistan

Road Development

Construction/ Metaling of Road from Gorikote Astore to Shagharthang Skardu

Design Review & Construction Supervision of Inter-Regional Connectivity between Baltistan and Diamer-Astore Division(Road Metaling from Gorikot–Astore to Shagarthang–Skardu) This project focuses on strengthening inter-regional connectivity between Baltistan and Diamer-Astore Division through the improvement and upgrading of an important road corridor. The assignment includes: Design review to ensure compliance with engineering

Construction Supervision of Inter - Provincial Connectivity Economic Corridor Through Gilgit – Baltistan & AJ&K (Thallichi GB – Shounter AJ&K)
Road Development

Management and construction supervision of Astore Valley Road (AVR)

This project represents a communication sector initiative focused on improving road infrastructure in a remote and mountainous area. The work involves developing a reliable road network to connect isolated communities with main urban centers. The project includes: Construction and rehabilitation of road corridors Development of bridges and culverts for water

Construction of Road from Pissan to Hoper Nagar (40 Km) I/C Bridges and Allied Structures ( Shahrah e Nagar)
Road Development

Construction of Road from Pissan to Hoper Nagar (40 Km) with LC Bridges and Allied Structures

This project focuses on the development of a 40-kilometer road corridor connecting Pissan to Hoper Nagar in Gilgit-Baltistan. The initiative is part of the communication sector aimed at improving connectivity in remote mountainous regions. The scope includes: Construction of a new road alignment across difficult terrain Development of LC (Low-Cost)

Development and Usage of Hydropower and Renewable Energies in Khyber Pakhtunkhwa PPAF
Solar PV

Development and Usage of Hydropower and Renewable Energies in Khyber Pakhtunkhwa PPAF / INTEGRATION GmbH

The project supports provision of renewable and reliable electricity to the poor communities in KPK province of the country by development of Mini/Pico grids based on PV and hydro technologies. Furthermore, the project also includes a bio-diversity component which address the environmental mitigation aspects related to the development of the

Solar PV

Consultancy services for 340 kW MHP/PV Hydro-Solar Hybrid Mini Grid in Dara-e-Noor district UNDP Afgh./ INTEGRATION GmbH

The Ministry of Rural Rehabilitation and Development (MRRD) with support from UNDP has made funds available for construction of a 340 kW Mini Hydro/PV Hybrid Plant in Shemol village with associated reticulation in Nangarhar Province. Shemol village is located at 25km from centre of the province. The project will cater

Solar PV

Feasibility Study for Solar Generation in GB Government of Gilgit Baltistan

The objective is to screen the entire area of Gilgit Baltistan (GB) with respect to solar irradiation, select suitable sites for PV systems, elaborate feasibility, final design and grid connection options, provide tender document and related PC-1 and to support in decision making and follow up procedure. The project is

Solar PV

Management and Supervision Punjab Ujaala Program – Solarization of 4200 Schools Government of the Punjab

The Energy Department Punjab intends to solarize 4,200 Schools across central and northern Punjab. INTEGRATION’s role is: Assisting the PMU in implementation of the project to the specified standards, completed on schedule, ensuring a proper monitoring of the results and with no cost overrun, providing advisory and capacity development for

Solar PV

Renewable Energy and Energy Efficiency II

The REEE II programme has 4 different components: Component 1 - Grid Integration of RE: Support grid operators to adjust their grid operation processes to the increasing share of RE. This includes capacity building, introduction of new grid planning- and operation tools, supporting advanced grid studies and development of sustainable

Solar PV

Feasibility for Solar PV Project in Muzaffargarh Near Multan (600 MW) 2022

Feasibility study and tender Design for 100 MW Solar PV Project in Konodas Top Gilgit District including: Topographic Survey Geotechnical, Geological and Seismic Aspects Hydrological Analysis Power Supply and Demand Solar Potentials Power Output System Topology and Site Infrastructure Grid Stability Aspects Location: Pakistan Cost: 35,000 €