Feasibility Study for the HRE III Project – Conducted feasibility studies for multiple micro-hydropower sites and updated the detailed design for a new 4 MW Batura hydropower plant under the HRE III program (Hydropower & Renewable Energy III); delivered feasibility reports and revised designs to the client.