Feasibility Study for Construction of Hydropower Project on Gilgit River at Sonikot (Gilgit) – Carried out a detailed feasibility study (including site investigations, engineering designs, and environmental study) for a proposed 5–10 MW hydropower plant at Sonikot; prepared the feasibility report, detailed drawings, and bidding documents (PC-1) for the client