Feasibility for Solar PV Project in Konodas Top Gilgit (100 MW) 2022

Feasibility study and tender Design for 100 MW Solar PV Project in Konodas Top Gilgit District including: Topographic Survey Geotechnical, Geological and Seismic Aspects Power Supply and Demand Solar Potentials Power Output System Topology and Site Infrastructure Grid Stability Aspects Cost Estimate Economic and Financial Analysis Initial Environmental Examination (IEE)

1.0 MW Solar PV at Duikar Altit Hunza, 1.0 MW Solar PV at Nasirabad Hunza GIZ / INTEGRATION GmbH
Solar PV

1 MW Solar PV Projects – Hunza (Duikar & Nasirabad)

Feasibility study and tender Design for two solar PV Projects (1 MW Each) in Hunza District including: Topographic Survey Geotechnical, Geological and Seismic Aspects Power Supply and Demand Solar Potentials Power Output System Topology and Site Infrastructure Grid Stability Aspects Cost Estimate Economic and Financial Analysis Initial Environmental Examination (IEE)

Hydropower

Development of Energy Master Plan for Chitral (Khyber Pakhtunkhwa) (NPAK)

Development of Energy Master Plan for Chitral (Khyber Pakhtunkhwa) – Prepared an integrated energy master plan for Chitral district (KP) under the EU-funded Energy Plus program; assessed renewable energy options (hydro, solar, etc.), conducted demand projections, and delivered an actionable master plan with investment recommendations.

Pamir Energy
Hydropower

Pamir Energy (Low Head Hydropower Project (1.4 MW) Hunza River )

Low Head Hydropower Project (1.4 MW) Hunza River – Feasibility Study, Design and Procurement – Conducted feasibility study and detailed engineering design for a 1.4 MW hydropower scheme in Hunza; delivered feasibility report, working drawings, and tender documents, and assisted in procurement negotiations.

Hydropower

Water and Power Division Gilgit (30 MW 0

Design, Construction Supervision and Contract Management for 30 MW Hydropower Project Ghowari (Ghanche, GB) – Prepared tender designs, initial environmental examination (IEE) reports, and bidding documents for the 30 MW Ghowari hydropower project; provided supervision and contract management throughout the 5-year construction period.

Hydropower

Water and Power Division Gilgit (20 MW Hydropower )

Monitoring & Evaluation Consultant for 20 MW Hydropower Project Hanzel (Gilgit) – Served as M&E consultant during project implementation; monitored construction progress and quality, verified contractors’ work measurements and payments, managed project reporting, and evaluated project outcomes for the 20 MW Hanzel hydropower project.

Hydropower

Water and Power Division Gilgit (5–10 MW )

Feasibility Study for Construction of Hydropower Project on Gilgit River at Sonikot (Gilgit) – Carried out a detailed feasibility study (including site investigations, engineering designs, and environmental study) for a proposed 5–10 MW hydropower plant at Sonikot; prepared the feasibility report, detailed drawings, and bidding documents (PC-1) for the client

Water and Power Division Gilgit (4 MW Batura hydropower)
Hydropower

Water and Power Division Gilgit (4 MW Batura hydropower)

Feasibility Study for the HRE III Project – Conducted feasibility studies for multiple micro-hydropower sites and updated the detailed design for a new 4 MW Batura hydropower plant under the HRE III program (Hydropower & Renewable Energy III); delivered feasibility reports and revised designs to the client.

Hydropower

Development of Energy Master Plan for Gilgit Baltistan (NPAK)

Development of Energy Master Plan for Gilgit Baltistan, Pakistan – Developed a comprehensive energy master plan for Gilgit-Baltistan, including GIS-based resource mapping, 20-year demand forecasts, and a prioritized investment pipeline; provided policy, regulatory and financing recommendations to NPAK (Energy Dept. GB).

Hydropower

22 MW Jabban Hydel Project (AFD)

Conducted an ex-post evaluation of the 22 MW Jabban Hydel Project, including a cost–benefit analysis, and prepared evaluation reports with final recommendations for the rehabilitated hydropower station.